The toilets are already done, thanks to HDB upgrading the entire estate. It's all standard stuff inside. My dad had to get new faucets for me coz the new ones take up too much space in the bathroom. It's meant for much bigger showers than this.


The kitchen was hacked up by the contractors and re-tiled nicely in what looks like marble. The kitchen cabinets are also done up in marble laminate to match the walls. We were deciding on what stone counter-top to use, I really like light green but it looks like jade and is too premium for a HDB flat. In the end we went with black marble composite with silver-ish glitter inside. The new kitchen sink is much bigger and comes with a drying rack on top of it. The only thing I am not sure about is the removal of the breakfast counter that has been replaced with a tempered glass panel.


New gate got installed, along with the new door, both from HDB upgrading works. The painters came around and I got a real headache coz the place is a mess and they wanted to confirm colours and dates.


In the meantime, we've been eating a lot of takeaways.


Trying out this instant hotpot available in 2 flavors, beef or vegetarian. Just add water and wait 15-20 minutes before eating. It's 麻辣火锅 all right, authentic and delicious, except it costs over $20 each. The price includes potato noodles, various mushrooms & root veges, quail eggs, meat. 


That's real steam coming out of the lunchbox. It goes on for another 20 mins or so. I want to drink all that soup down coz its soo delicious, but my mouth was numb by then.


No comments:

Post a Comment

Your comment will take some time to appear. Please be patient.